OAKLAND BAY BRIDGE 504 AND 288 SPAN DISMANTLING

Bridge removal plans for five 504 ft spans and 14 288 ft spans, including design of truss retrofit members, span lowering structures, span dismantling plans (on barges), and substructure removal. Foothills Bridge Co also provided full-time on-site support.

  • Location:
    San Francisco, CA
  • Date:
    2017