SR 520 FLOATING BRIDGE REPLACEMENT

Removal plan for 300-ton transition span truss structures using a marine crane, including deck removal, rigging design, and weight verification using hydraulic jacks.

  • Location:
    Belleview, WA
  • Date:
    2016